A Case Study on the Strategic Impact of Information Technology in the Turkish Construction Industry
CIB W078 International Conference on Managing IT in Construction, İstanbul/TÜRKİYE, 1 Ekim 2009, s. 431-437
ÇAKMAK FATMA PINAR,TAŞ ELÇİN FİLİZ
|
An Analysis of Causes of Disputes in the Construction Industry Using Analytical Hierarcy Process (AHP)
AEI 2013 Architectural Engineering Institute Conference, Pennsylvania/AMERİKA BİRLEŞİK DEVLETLERİ, 3 Nisan 2013, s. 93-101
ÇAKMAK FATMA PINAR,ÇAKMAK EMRE
|
Evaluation of the Conditions of the Contract used in the Turkish Construction Industry
International Journal of Academic Research, No. 6(2), 2014, s. 123-129
FATMA PINAR IRLAYICI CAKMAK,TAŞ ELÇİN FİLİZ
|
A Comparative Analysis of Owner Contractor Agreements in Turkish and US Construction Industry
Journal of Civil Engineering and Architecture, Vol. 8, No. 4, Nisan 2014, s. 492-498
FATMA PINAR IRLAYICI CAKMAK,TAŞ ELÇİN FİLİZ
|
Total Quality Management in Kazakhstan Construction Industry A Case Study
2nd MEQA Annual Congress, Middle East Quality Association, 7-9 April, 2008, Dubai, UAE., No. 1, 7 Nisan 2008, s. 1
AKDAĞ HATİCE
|
An investigation into the relationship between personality and learning styles in construction industry: As a potential tool for improving health and safety performance
International Journal on Working Conditions, No. 12, Aralık 2016, s. 118-134, ISSN: 2182-9535
SERTYEŞİLIŞIK BEGÜM,TEZEL ECEM,GİRİTLİ FATMA HEYECAN,VATANSEVER NECATİ
|
From an Institutional Perspective, a Road-mapping Design for Reduced Occupational Accidents in the Turkish Construction Industry
9. Uluslararası İş Sağlığı ve Güvenliği Kongresi, İstanbul/TÜRKİYE, No. 54, 6 Mayıs 2018, s. 162
KİRACI İBRAHİM,ABALI MUSTAFA,YILDIRIM NİHAN,KARAKAŞ DERYA
|
The Effect of Economical Development on Project Management in Developing Countries
Challenges Facing the Construction Industry in Developing Countries, GABORONE/BOTSVANA, 1 Ocak 2000
KURUOĞLU MURAT,ERGEN PEHLEVAN ESİN
|
An Institutional model for diffusion and implementation of Innovation in Construction Industry Case Study of CCI
Salford Postgraduate Annual Research conference (SPARC), Manchester/İNGİLTERE, 10 Mayıs 2007, s. 159-168
İLTER AKIN TOLGA
|
Relative Importance of Productivity Factors in Construction Industry
6th International Project and Construction Management Conference, İstanbul/TÜRKİYE, 12 Kasım 2020, s. 645-650
BİLİR MAHÇİÇEK SENEM, GÜRCANLI GÜRKAN EMRE
|
Applicability of The Hazard Rating Number System in The Construction Industry
The XXVIIth Occupational Ergonomics and Safety Conference, Tennessee/AMERİKA BİRLEŞİK DEVLETLERİ, 28 Mayıs 2015, s. 7-12
BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
|
Determination Of Activity Based Accident Frequencies In Building Construction Projects
12th International Congress on Advance in Civil Engineering, 21 Ekim 2016
BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
|
A Method to Calculate The Accident Probabilities In Construction Industry Using A Poisson Distribution Model
7th International Conference on Applied Human Factors and Ergonomics, 27 Temmuz 2016
BİLİR MAHÇİÇEK SENEM,GÜRCANLI GÜRKAN EMRE
|
Investıgatıon of Productıvıty in the Constructıon Industry
6th International Project and Construction Management Conference, İstanbul/TÜRKİYE, 12 Kasım 2020, s. 641-644
BİLİR MAHÇİÇEK SENEM, GÜRCANLI GÜRKAN EMRE
|
Weight Construction in Extended Space Expectation Values for Singular Quantum Systems at Spectral Structuring and Temporal Constancy Limit
International Conference on Mathematics and Computers in Science and in Industry, 13 Eylül 2014
KALAY BERFİN,DEMİRALP METİN
|
A decision model for customer order prioritization and facility layout design, a case study for structural steel production in construction industry
Fen Bilimleri Enstitüsü, İstanbul Teknik Üniversitesi, 2018
BURCU NALBANTOĞLU
|
Discussion of design for disassembly principles under the guidance of design for manufacture and assembly strategies in the construction industry
Lisansüstü Eğitim Enstitüsü, İstanbul Teknik Üniversitesi, 2023
ESMA GÜL AYDENİZ
|
A critical approach to the literature on reasons for delay; and perception of the reasons for delay in the Turkish construction industry
Lisansüstü Eğitim Enstitüsü, İstanbul Teknik Üniversitesi, 2021
ONUR SELÇUK
|
Report on Price Bank and Life Cycle Inventory Performance Characteristics
CILECCTA (A user-oriented, knowledge-based suite of Construction Industry LifE Cycle CosT Analysis s, 2010, AB 7. Çerçeve Proje Raporu (Proje No 229061)
R. HARTWIG, R. URQUIJO, S. ALBRECHT, V. CARILLO, A. DIKBAS, H. GIRITLI, D. ILTER, I. TEKCE, J. KREISIG, K. LOEWE
|
Report on Price Bank and Life Cycle Inventory Performance Characteristics
CILECCTA (A user-oriented, knowledge-based suite of Construction Industry LifE Cycle CosT Analysis s, 2010, AB 7. Çerçeve Proje Raporu (Proje No 229061)
R. HARTWIG, R. URQUIJO, S. ALBRECHT, V. CARILLO, A. DIKBAS, H. GIRITLI, D. ILTER, I. TEKCE, J. KREISIG, K. LOEWE
|